Installation Procedure
DANGER |
|---|
|
hazard of electric shock, explosion or arc flash
Place the battery circuit breaker box as close to the
battery bank as possible to limit the length of unprotected battery
cable. The distance between the battery bank and the UPS must not
exceed 200 m. Contact Schneider Electric for installations with a
longer distance.
Failure to follow these instructions will result in death or serious injury.
|
- Mount the Battery Circuit Breaker Box to the Wall.
- Prepare the Battery Circuit Breaker Box for Cables.
- Connect the signal cables. Perform one of the following
procedures:
- Connect the Signal Cables for GVBBB630EL-1CB to the Galaxy VS UPS, or
- Connect the Signal Cables for GVBBB630EL-1CB to the Galaxy VL UPS, or
- Connect the Signal Cables for GVBBB630EL-2CB and GVBBB630EL-3CB to the Galaxy VL UPS, or
- Connect the Signal Cables for GVBBB630EL-1CB to the Galaxy VXL UPS, or
- Connect the Signal Cables for GVBBB630EL-2CB to the Galaxy VXL UPS, or
- Connect the Signal Cables for GVBBB630EL-3CB to the Galaxy VXL UPS, or
- Connect the Signal Cables for GVBBB630EL-1CB to the Galaxy PX 300-600 kW, or
- Connect the Signal Cables for GVBBB630EL-2CB to the Galaxy PX 300-600 kW, or
- Connect the Signal Cables for GVBBB630EL-3CB to the Galaxy PX 300-600 kW, or
- Connect the Signal Cables for GVBBB630EL-1CB to the Easy UPS 3-Phase Modular, or
- Connect the Signal Cables for GVBBB630EL-2CB to the Easy UPS 3-Phase Modular, or
- Connect the Signal Cables for GVBBB630EL-1CB to the Easy UPS 3M Advanced, or
- Connect the Signal Cables for GVBBB630EL-2CB to the Easy UPS 3M Advanced.
- Connect the Power Cables.
- Add Translated Safety Labels to Your Product.
- Final Installation Steps.
DANGER